Reviews
Since it was that it was a vacation today and rain, the POSH Posh Stainless touring bar neglected with after-purchase attachment not performed was attached. It attaches in about 1 hour and about 20 minutes in time, and is completion. The fixing hole for
Since it was that it was a vacation today and rain, the POSH Posh Stainless touring bar neglected with after-purchase attachment not performed was attached. It attaches in about 1 hour and about 20 minutes in time, and is completion. The fixing hole for a Switch is made in the bar, and positioning of a Switch is easy. However, it differs in appearance that the hole which fixes a Cable is not open as a different point from an Original from the point that there is no Drain hall in a Center and that there is no position mark to clamp (it is not a center although the POSH sticker is stuck). A Clamp position will be simply decided, if it piles up with an Original and a position is copied on a Tape. Moreover, to an Original, since welding fixation of the weight is carried out at the Bar end (is it the purpose of easing vibration of a Handle?), I wish for vibration of a Handle to check how much it changes, and to see it. If it checks the Test sheep and later for rain, it rises again today. View detail